Our largest delivered plant — 1.5 MW — is here, in one of the highest-irradiance districts in Karnataka.
Raichur is where our largest plant runs. At 1.5 MW the engineering is a different discipline from rooftop work: structural design for long spans, high-voltage interconnection, protection coordination, and a substation and distribution scope that has to be right before a single panel earns anything.
The district has among the highest solar irradiance in Karnataka, which is why generation projects concentrate here. It is also demanding on equipment — heat and dust are the two conditions that most affect long-term yield, and both are severe.
High irradiance and long clear seasons make the district well suited to generation at scale.
At this size the grid interface involves higher-voltage connection, protection coordination and testing that a rooftop application never touches.
Both reduce yield if ignored. Mounting clearance, cable specification and a realistic cleaning regime matter more here than in milder parts of the state.
Gulbarga Electricity Supply Company
Raichur falls under GESCOM. At megawatt scale the approval process involves higher-voltage interconnection and protection requirements than a rooftop application.
How net metering works, step by stepSend a recent electricity bill and we will size a system for your roof and handle the utility paperwork.