One contract, one accountable party, from first drawing to grid synchronisation.
EPC means engineering, procurement and construction delivered as a single responsibility. Instead of coordinating a designer, a supplier and an installer — and absorbing the gaps between them — you hold one contract with one party answerable for the result.
That matters most when something goes wrong. A split scope invites the design, supply and installation parties to point at one another; a single EPC contract does not leave that gap.
One contract covering design, supply, construction and commissioning.
The system is designed for your site first, then equipment is bought to suit — not the other way round.
DISCOM applications, inspections and synchronisation are part of the scope, not your problem to chase.
Drawings, datasheets, test records and monitoring access provided at completion.
Site assessment, shadow analysis, structural review, electrical design and generation modelling.
Panels, inverters, mounting structures, cabling and protection equipment sourced against the approved design.
Civil and structural work, mechanical installation, electrical termination and testing.
Protection checks, DISCOM inspection, grid synchronisation and performance verification.
Documentation, monitoring access and an agreed support arrangement.